Monday, March 22, 2010

Window and door holes



This weekend I made significant progress on framing the openings for the windows and front door. I had skipped this part in the initial construction in order to get a covered structure completed in time for the monsoons here in Tucson. It is amazing how much easier it is to complete these framing components on the ground first, rather than building them up within the built structure. For one thing, you can hammer in pieces from the sides of the studs, rather than relying on metal "L" brackets due to a lack of hammering room between studs. This results in a much more efficient (and cheaper) construction. Of course, there is the issue of installing one of these heavy-ish pre-built components...we'll see how that goes next weekend.


Door and loft window framing components


Door and loft window framing completed, and Elsie.